Wetlands FAQs

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

QA small

Frequently Asked Questions

Can EPC wetland lines be accepted by the state?

Please be advised, due to the current State assumption of the federal Section 404 Clean Water Act program, all wetland and other surface water boundary delineations accepted by the EPC will be subject to future State review prior to being accepted by the Florida Department of Environmental Protection or the Southwest Florida Water Management District.  EPC lines may not be accepted by the State and will be subject to future modification by the State agencies.  The delineation of the boundary will be based on the same wetland or other surface water methodology adopted in Section 62-340, Florida Administrative Code, however, the lines must be field verified by the State prior to being accepted under the 404 program.                                                                               

Who is registered as a professional mangrove trimmer in Hillsborough County?

Please see the current list of registered professional mangrove trimmers.

How do I register as a professional mangrove trimmer in Hillsborough County?

Register with EPC as a Professional Mangrove Trimmer in Hillsborough County.

How much does it cost to permit a dock?

See EPC fee schedule, section 1-6.05 5. or 9.(b)

What is the process to permit a dock?

Visit our permit descriptions page. Generally, once an application is received, a site inspection is conducted by staff. Once staff deems the application complete, permit/ noticing is issued.

What is a wetland?

Under normal circumstances, wetlands will be identified by visual application of the definition of wetlands considering the dominance of plant species, soils and other hydrologic evidence indicative of regular and periodic inundation or saturation.

How do I know if I have a wetland?

Submit a wetland delineation application

How do I know if I meet the mangrove noticed exemption criteria or if I need a permit?

Visit our permit descriptions page. Generally, if you are conducting maintenance trimming, it would be a noticed exempt activity. There may be additional restrictions based on your shoreline length, mangrove fringe width, and the pretrimmed height of the mangroves.

How low can I trim my mangroves?

See EPC Chapter 1-14. Generally, the lowest height is 6 feet from the substrate, however, there may be trimming restrictions based on the mangroves’ pretrimmed height.

Do I need a permit to remove a dock?

A permit is not required to remove a dock; however, a written de minimis determination, though not required, can be provided upon request. To request a de minimis determination for the removal of a dock, please contact Wetlands staff at WetlandsPermits@epchc.org or at 813-627-2600 ext. 1239.

What is the setback from my wetland line?

Please contact Natural Resources within the Development Services Department of Hillsborough County at 813-272-5600. EPC does not regulate the setback distances from wetlands.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer